State

Not established in reviewed sources

Open question

Is this unit in contracted commercial operation, and what delivery or interruption is on record?

  • Not established in reviewed sources: Independent confirmation of the September 2026 grid synchronization and commercial operation
  • Not established in reviewed sources: Whether GeoBlocks 2 and 3 met the January 1, 2027 contractual date
  1. TargetTarget: commercial operation, Jan 1, 2027Stated 1 October 2026 · Company reported · Fervo Energy (SEC filing, Form 8-K exhibit)

    Source: Fervo Energy (SEC filing, Form 8-K exhibit) ↗

  2. TargetTarget: commercial operation, 2026Stated 28 June 2024 · Secondary report · Utility Dive

    Source: Utility Dive ↗

Evidence detail

Target: commercial operation, Jan 1, 2027

Target as of October 2026: GeoBlocks 2 and 3 contractual COD by January 1, 2027; Phase II (400 MW) COD in 2028

A stated target, not something that has happened. It does not set a state. Targets can move; earlier and later ones are both kept.

“Commissioning continues at the remaining two Phase I GeoBlocks, which are expected to reach contractual COD by January 1, 2027. The next phase, an additional 400 MW, is already under construction, with an expected COD in 2028.”
Attribution
Company reported
Publisher
Fervo Energy (SEC filing, Form 8-K exhibit)
Target stated
1 October 2026
First public disclosure
1 October 2026
Source read
11 November 2026

Inspect primary source: Fervo Energy (SEC filing, Form 8-K exhibit) ↗

What this does and does not establish

An exact passage match shows the source says this. It does not prove the underlying claim is true.

Watch operational deliveryInspect project history