Who it is for

Analysts, consultants, suppliers and project teams who need to know when a specific project actually moved: a permit issued, financing closed, a unit synchronised, a contract signed. People who would otherwise re-read notices and filings to find out.

What counts as a change

A new sourced statement that moves one dimension of one unit to a different state, in either direction. A delay, a withdrawal or a failed test counts. A repeat of something already on record does not, and a target never counts as the thing it targets.

When you hear

After a change is published to the record, in your next daily or weekly briefing, or as a separate alert if you turn those on. No alert is sent during your quiet hours; the change still appears on your watchlists page and in your next briefing. If a statement is later withdrawn or corrected, you get one correction for anything we already sent you.

Sample alert · built from a stored record

Cape Station GeoBlock 2: synchronised to the grid

Dimension
Commissioning
Before
Not established in reviewed sources
Now
Synchronised to the grid
Attribution
Company reported · Fervo Energy (SEC filing, Form 8-K exhibit)
Dated
9 November 2026
“GeoBlock 2 has achieved grid sync, a major milestone, which marks the end of hot commissioning.”

Synchronised is not commercial operation.

Open the project record →Source: Fervo Energy (SEC filing, Form 8-K exhibit) ↗

This is a historical record shown as an example, not a new alert.

Example weekly briefing

  1. 9 November 2026 · Commissioning

    Cape Station GeoBlock 2: synchronised to the grid

    Before: Not established in reviewed sources. Company reported · Fervo Energy (SEC filing, Form 8-K exhibit)

  2. 9 November 2026 · Commissioning

    Cape Station GeoBlock 2: exporting test energy

    Before: Not established in reviewed sources. Company reported · Fervo Energy (SEC filing, Form 8-K exhibit)

  3. 9 November 2026 · Commissioning

    Cape Station GeoBlock 3: cold commissioning

    Before: Not established in reviewed sources. Company reported · Fervo Energy (SEC filing, Form 8-K exhibit)

Assembled from the newest stored records as of 11 November 2026. A real briefing contains only changes in what you follow, and says so plainly when there were none or when a source could not be checked.

What you can follow

  • A whole project, for any material change
  • One unit of a project, such as a single block or reactor
  • One dimension of one unit, such as commissioning
  • One exact milestone, after which the rule retires itself
  • A company or a technology, across the projects we maintain

You can mute, resume or cancel each one. Lists are private unless you deliberately share one with your team.