Evidence detail
Design disclosed
Plant design as described in the NRC final environmental impact statement notice
A disclosed design is not a tested one.
“The proposed facilities would house one 840-megawatt thermal, pool-type, sodium-cooled fast reactor connected to a molten salt energy storage system that enables variable energy supply up to 500 megawatts electric net.”
- Attribution
- Regulator issued
- Publisher
- U.S. Nuclear Regulatory Commission (Federal Register)
- Dated
- 23 October 2025
- First public disclosure
- 23 October 2025
- State before
- Not established in reviewed sources
- Source read
- 11 November 2026
Inspect primary source: U.S. Nuclear Regulatory Commission (Federal Register) ↗
What this does and does not establish
An exact passage match shows the source says this. It does not prove the underlying claim is true.