FinancingCompany-reported

What was reported

Eos Energy Enterprises Receives $87 Million Advance Under U.S. Department of Energy Loan to Fund Second Production Line at Thorn Hill First advance under second tranche brings total drawn under the DOE facility to $178 million and supports 4 GWh of annual battery manufacturing capacity in Western Pennsylvania PITTSBURGH, PA – September 14, 2026 – Eos Energy Enterprises, Inc. (NASDAQ: EOSE) (“Eos” or the “Company”), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced it has received an $87 million first advance under the second tranche of its loan agreement with the U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF).U.S. Securities and Exchange Commission (EDGAR) · Exhibit 99.1 to 8-K · Sep 14, 2026 · Open the source ↗

What the evidence supports

Eos Energy Enterprises told the SEC (Form 8-K, Item 2.03) that it entered into a financing arrangement or sold its securities. The filing gives Sep 10, 2026 as the date of the earliest event reported. The company also furnished a press release, which is its own account rather than a regulatory statement.

What remains unknown

How much money will actually be raised or drawn, at what final price, and how it will be used beyond what the company stated. Stated amounts can be maximums or targets rather than money already received.

Figures as stated

Numbers exactly as written in the source. We don’t annualise, convert or add them up.

FigureIn context
$178 million“Eos has now drawn a total of approximately $178 million of its DOE facility since 2024.”

Source passages

Exact excerpts from the source, with links. Quotes are checked character for character against our stored copy.

Press release lead paragraphEos Energy Enterprises Receives $87 Million Advance Under U.S. Department of Energy Loan to Fund Second Production Line at Thorn Hill First advance under second tranche brings total drawn under the DOE facility to $178 million and supports 4 GWh of annual battery manufacturing capacity in Western Pennsylvania PITTSBURGH, PA – September 14, 2026 – Eos Energy Enterprises, Inc. (NASDAQ: EOSE) (“Eos” or the “Company”), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced it has received an $87 million first advance under the second tranche of its loan agreement with the U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF).U.S. Securities and Exchange Commission (EDGAR) · Exhibit 99.1 to 8-K · Sep 14, 2026 · Open the source ↗
Amount stated in press releaseEos has now drawn a total of approximately $178 million of its DOE facility since 2024.U.S. Securities and Exchange Commission (EDGAR) · Exhibit 99.1 to 8-K · Sep 14, 2026 · Open the source ↗
Amended filing (Form 8-K/A filed Sep 16, 2026), Item 5.02 textIn connection with the transition of his role and pending separation, on September 10, 2026, the Company entered into a separation agreement with Mr. Kroeker (the “Separation Agreement”).U.S. Securities and Exchange Commission (EDGAR) · 8-K/A: 8-K/A · Sep 16, 2026 · Open the source ↗

Revision history

  1. Revision 2 · Nov 11, 2026, 21:10 UTC

    Eos Energy Enterprises reports a new direct financial obligation (Form 8-K, Item 2.03)

    Updated to reflect an amended filing (Form 8-K/A) filed on Sep 16, 2026.

  2. Revision 1 · Nov 11, 2026, 21:10 UTC

    Eos Energy Enterprises reports a new direct financial obligation (Form 8-K, Item 2.03)

Spotted an error? Tell us. Corrections are published, never silent: see all corrections.